Details, Fiction and CPSR
If one of those criteria is found to have a significant deficiency, the contractor’s entire system is considered for being unacceptable. In such cases, not merely need to the contractor receive consent to subcontract, in accordance with DFARS 252.242-7005, which is necessary to generally be A part of CAS lined contracts that also contain a number